ENGN8170 · GROUP 01 · U02 · 6 OCTOBER 2026 · R1

Integrated top-down controller upper.

Design evidence issued 6 October; installed checks recorded through 12 October. U02 replaces the difficult U01 upper while retaining the existing B01 body and electronics. The later physical results are controlled in the project Test Plan.

1. Why the design changed

User feedback recorded that U01 was positioned correctly, but support removal was difficult. The inner surfaces were rough, and small features broke near the four fan screw or nut locations and the outlet ribs.

U02 removes the inclined side passage. The lid, hood, fan pads and grille now form one connected solid. The fan sits horizontally above the A4988 reference region, with intended intake through the top grille and downward airflow.

The failure mechanism was not instrumented or formally inspected. The redesign responds to the observed manufacturing difficulty; it does not prove improved strength, airflow or cooling.

2. Selected configuration

ItemSelected design or boundary
Printed upperOne U02 part integrates the lid, hood, fan frame and grille.
Retained hardwareB01 body, PCB supports and clamps, electronics, and the SUNON fan.
FastenersThree M3×20 lid screws and four M3×20 fan screws, with standard nuts and washers for the fan.
Preserved accessControls, LED and power openings, Nano and USB access, and existing body wiring access.
Reference clearanceThe fan lower face is nominally 13.5 mm above the A4988 reference top. This is not a measurement of the installed hardware or wiring.

3. Digital and slice evidence

89generator geometry checks passed
49independent geometry and access checks passed
6 h 43 min 37 sselected roof-down slice estimate
169.58 gestimated total deposition, including 93.92 g support

The native project reload, triangle identity, non-mirrored transform and MK4S build-volume checks passed at their digital scope.

The estimated part polymer is 75.16 g. The selected orientation trades fewer assembly interfaces for extensive support material and a higher replacement cost. No printer-GUI confirmation is claimed.

4. Air-path calculation boundary

Geometric sectionAreaInterpretation
Top grille clear opening645.13 mm²Mesh section only; fan blades, hub and physical wires are excluded.
Front outlets912.00 mm²Two 24 × 19 mm windows.
Rear opening918.00 mm²Parallel exit and wiring opening.
Nano-side opening610.39 mm²Parallel exit and service opening.

The new grille area is 12.18% below the historical U01 grille value of 734.62 mm². A shorter path does not prove greater flow.

Installed operating point: Δp_fan(Q) = Δp_system(Q)
Bulk-air energy balance: P_to_air = ρ cₚ Q_useful ΔT_air

Installed flow requires the actual fan curve and system resistance. Geometric access and clear area do not establish a cooling result.

5. Later physical verification status

No source, no fact. No trace, no decision. No test, no pass. This 6 October digital package does not establish the later physical outcomes by itself. The current Test Plan and dated evidence carry those results; no unrestricted thermal rating or final acceptance is inferred.

6. Current physical evidence

12 October: installed enclosure and 500-cycle water-loaded result. Fan on, enclosure closed, bucket and water, no specimens. No abnormal behaviour was reported.

Nano: 26.1 → 24.8°C. A4988: 26.1 → 25.7°C. These measured observations do not establish an unrestricted duty rating.

Three buttons are active. The existing knobs remain installed for handover but are inactive in firmware. The 13.5 mm clearance and fastener specification above are CAD references, not a newly verified installed BOM.

Fabrication files remain in the controlled team package. Current machine configuration and dated physical results are maintained on the machine page.