Remove the complete upper and install the fan from below. Separation distance is illustrative; parts are not mirrored.
Fan blades, motor hub and wiring are not modelled. Orange arrows illustrate direction; they are not a flow simulation. Digital interference checks passed. Physical records confirm U02 installation, fan direction, and enclosure and wiring clearances.
On 12 October, the fully assembled machine completed 500 cycles in ten minutes with bucket and water, no specimens, fan on and cover closed. No issues were reported. This does not establish unrestricted thermal duty or final acceptance.
Read the 12 October run and temperature record ·
Current photographs and evidence